
Wagner Oil’s Caceria Building, the new 7-story office/retail building at the corner of 5th & Commerce, is one floor away from topping out. The facade should start going up soon.

Wagner Oil’s Caceria Building, the new 7-story office/retail building at the corner of 5th & Commerce, is one floor away from topping out. The facade should start going up soon.
Posted in: Architecture & Urban Design, Downtown, Urban Commercial, Urban Retail.
© 2008 Kevin Buchanan | Powered by WordPress

0 Comments on “Caceria Building nearly topped out”
Leave a Comment